Space and demand, in that order
Installation in Pardee starts with the physical constraints: flue route, clearances, access, whether a pan can drain somewhere useful. Then demand: how many people, how many bathrooms, and whether laundry and dishes collide in the same hour.
A unit chosen before those two questions is a unit that gets fitted correctly and still disappoints.
What the job delivers
Venting to the manufacturer's specification for that exact unit. Strapping in the upper and lower thirds, the lower strap clear of the controls. A relief valve with its discharge piped to a safe point. A pan and drain where a leak would reach structure. The gas or electrical supply checked against the new heater, with the old unit removed.
Living with hard water
The supply measures 240 mg/L of calcium carbonate, so the new install is when the maintenance habit starts: flushing a tank, descaling an exchanger. Beginning on day one costs less than starting after the first cold shower.