Constraints, then demand
Installation in Bouquet Junction begins with the location: flue route, clearances, access, whether a pan can drain somewhere useful. Then demand: how many people, how many bathrooms, and whether laundry and dishes collide.
A heater chosen before both questions gets fitted correctly and still runs short.
What the job delivers
Venting to the manufacturer's specification for that unit. Strapping in the upper and lower thirds, the lower strap clear of the controls. A relief valve with its discharge piped safely. A pan and drain where a leak would reach structure. The supply checked against the new heater, with the old unit removed.
Living with hard water
At 240 mg/L of calcium carbonate, the new install is when the maintenance habit starts — flushing a tank, descaling an exchanger. Starting on day one costs less than starting after the first cold shower.